An installation manual should enable a competent person to assemble the work without reconstructing the artist’s decisions from memory. It does not replace the technical sheet: the sheet describes; the manual sets out actions and tests.
Start from the work’s technical sheet. If the work is going out on loan, also see How to lend a digital or technology-based artwork for an exhibition.
Identify version and scope
Include the work, identifier, version, edition, manual date, covered configuration, authorised persons and associated documents. Do not use an outdated manual for a different version without recording the differences.
The Metropolitan Museum of Art publishes, for time-based work, acquisition procedures and artist questionnaires by medium, including software-based work, as well as identity and iteration reports.
Before opening the packages
List space, power, network, tools, personnel, timings, risks, protective equipment and permits. Check the inventory, the packaging and the condition report.
Visual inventory
Assign an identifier to each component, cable, adapter, mount and spare part. Add photographs, measurements, serial numbers and who supplies each element.
Use the same name for each component throughout the manual and physically label every cable and piece of equipment with that identifier. A photograph of the completed cabling is more effective than a paragraph of text.
Floor plan and sequence
Include floor plan, elevation, distances, heights, projection, speakers, sensors, circulation and technical access. Number the steps in the real order: construction, mounts, cabling, equipment, software, calibration and validation.
Distinguish between the essential and the adaptable: what cannot be altered (for example, the height of a screen or the distance from the wall) and what is dependent on the venue. If the work includes accessibility solutions that are integral to it, specify that they must not be removed during installation; consult How to make a digital or interactive work accessible.
Connections
Use a diagram with source, destination, type, length and label. Distinguish power supply, data, video, audio, sensors and network. State what must be connected with the power supply disconnected.
If the work relies on the internet, include the network requirements. To document these, consult How to exhibit a work that depends on the internet or an API.
Software and configuration
Specify system, version, account, installer, paths, dependencies, environment variables, permissions, resolution, channels, automatic start-up, sleep, updates and firewall. Do not include active secrets in a shared PDF.
The Guggenheim acquisition checklist for computer-based work with an artist-provided computer asks for a written guide to installing and starting up the work, a list of hardware and software requirements and dependencies, and a list of external services and APIs. It states that each work is assessed case by case.
Calibration
Define values and tolerances: colour, brightness, focus, sound, synchronisation, latency, sensor, scale, and active area. Accompany each adjustment with the expected result.
Acceptance test
Prepare an observable checklist. The installation is not approved simply because the program starts. Check experience, duration, interaction, restart, sound, image, error log and stability. Also keep video or audio documentation of the work running correctly, as the Guggenheim acquisition checklist for computer-based work requests.
Daily operation
Indicate power-on, checks, opening, monitoring, closing, cleaning, ventilation, permitted reboots, and contact details. Separate gallery tasks from administrative tasks.
Failures and recovery
Include symptoms, safe actions, prohibited actions, logs, backup, restoration and alert escalation. Do not authorise updates, replacements or reinstallations without limits.
Safety
The risk assessment is the responsibility of the venue and competent professionals. Royal Decree 614/2001 sets minimum provisions for the protection of workers against electrical risk and applies to the electrical installations of workplaces. The INSST publishes a technical guide on electrical risk, in its fourth edition (2020), which explains that royal decree. Its full text has not been read, and no specific standard or certification for technology-based artworks installed in a venue has been located.
Document loads, anchors, heat, ventilation, trip hazards, liquids, lasers, motors, batteries, and public access where applicable.
Also specify the electrical power requirements of the work and whether there are any flashing lights that must be brought to the attention of the public.
Deinstallation
Reverse the sequence: safe shutdown, copy of the logs, revocation of credentials, agreed erasure, final report, inventory, packing and return. Coordinate with How to ship or transport a work.
Testing the manual
Have another person install the work using only the delivered package. Record doubts, tacit steps, timings and errors; correct the manual and re-date it.
Record every installation
Each time the work is installed, certain details change: a different room, a different screen, a new adjustment. The Metropolitan Museum of Art uses iteration reports to document every installation. Record where, when, with what equipment, what decisions were made, and why: over the years, these reports chronicle the life of the work and assist in planning future installations.
Store the reports with the master archive and the documentation for the work.
Checklist
- Manual linked to a specific version.
- Space, tools, personnel and risks planned for.
- Components visually identified.
- Floor plan, sequence and cabling complete.
- Software and configuration reproducible.
- Calibration and acceptance have observable criteria.
- Operation and recovery are kept separate.
- Deinstallation, erasure and return are described.
- Another person has tested the manual.
- The essential is separated from the adaptable, and accessibility elements that cannot be removed are documented.
- Every installation is recorded in a report.
Further reading
- How to prepare a technical sheet for a digital or interactive artwork.
- How to lend a digital or technology-based artwork for an exhibition.
- How to ship or transport a work.
- How to read a condition report for a work of art.
- How to make a digital or interactive work accessible.
- How to exhibit an artwork that depends on the internet or an API.
- What to retain as a master file of a digital work and how to name its versions.
On the open conversation
This guide remains open to corrections and documented cases. If you detect an error or a practice that would allow any of its steps to be refined, you may write to me.
Sources
- The Metropolitan Museum of Art, time-based media documentation templates. Acquisition procedures, artist questionnaires, and identity and iteration reports; page dated 8 February 2019.
- Guggenheim, acquisition checklist for computer-based work with an artist-provided computer. The document shows no date or version and does not name the institution in its text; attribution is based on the domain where it is hosted.
- BOE, Royal Decree 614/2001, of 8 June, on protection against electrical risk. Consolidated text; last update published 21 June 2001.
- INSST, technical guide for the assessment and prevention of risks related to protection against electrical risk. Catalogue entry, 2020 edition; the full text has not been read.